Simons Group is proud to have delivered a project which has enabled the Sheffield Children's NHS Foundation Trust to deliver on-going, world-class care to children in the UK.

The 77-week project saw Simons engaged on a two-stage procurement basis. Stage one involved working collaboratively with the Trust and its design team to provide expert advice on survey and investigations, buildability, design, specification, programme, methodology, target, cost, risk and contract. Stage two was completion of the design and full construction of the works.

The end result was a stunning three-storey extension with rooftop plantroom, basement car park and service yard and a 72-bedroom, en-suite inpatient and outpatient facility. This included consulting rooms, retail space, MRI shell, pharmacy and refurbishment of the existing in/outpatient facility. A new reception, complete with a giant two-storey play tube added to the improved user experience. The project also included the careful deconstruction of a two-storey building to allow construction of a new building and basement using the same stone.

Customer:

Sheffield Children’s NHS Foundation Trust

Location:

Broomhill, Sheffield

Project Team:

Simons Construction

Avanti Architects

Hoare Lea

Beaumont & Cowling

WYG Engineering

Value:

£33.8 million